Description

Installation Tube Head Wall Mount Custom Aesthetics

Specialized Custom Wall Mount Tube Head Installation

This includes cutting into the wall, and installing the appropriate internal wall blocking.
Drywall or other wall material will then be replaced.
Drywall will get 5 cycles of patching and sanding to smooth finish

Wall will then be painted to match existing wall surface and tube head will be installed on the blocking with minimal external footprint

If the wall has wallpaper or special paneling an attempt will be made to find and replace the paneling or wallpaper with a nearly identical product

If the wallpaper or paneling can not be replaced with something identical the dental office will be consulted about alternatives

This installation takes multiple days as drywall patching must dry in-between sanding and re coatings.

DISCLAIMER: Appropriate AC Power Circuit Must Be Present Where Customer Desires Generator To Be Installed